|
The package for the repair of the supporting structural metalwork, broadly fell into three main categories;
1. In-situ repair of the main roof trusses.
2. Removal of beams etc. for on site repair.
3. Replacement of individual elements damaged
beyond economic repair.
Mobilisation for the site included the erection of a fully equipped 2000 sq ft workshop together with accompanying offices and storage.
With the successful conclusion of the project McNealy Brown Limited have become further involved with Railtracks Station Regeneration Programme for London and the South East.

|